PDC Energy Case Study – Eliminating Tank Vapor Combustion Through 100% Vapor Capture
In 2017, PDC Energy identified a need to improve flow assurance while capturing tank vapor gas at a number of facilities in Colorado. This high-Btu gas was not able to be captured and sold when contaminated with oxygen, resulting in potential shut-in of the production facility or combustion of the gas with higher air emissions and…

